Computer Science
-
A design-thinking approach to identifying needs in a Danish healthcare setting
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelNeil Arvin Bretaña a b, Ea Høg Utoft c, Sys Zoffmann Glud aShow morehttps://doi.org/10.1016/j.procs.2023.01.410Get rights and contentAbstractThe Danish healthcare system is often hailed as a pioneer in quality health services and initiatives. […]
continue reading → -
Shipbuilding Engineer-To-Order Supply Chain: a Systematic Literature Review
Published in ScienceDirect Publication: Procedia Computer Science By Abstract This study aims to describe the state-of-art of the literature on engineer-to-order (ETO) supply chain in shipbuilding industry and identify related research gaps and directions for future research. Shipbuilding is a representative ETO industry: once a […]
continue reading → -
Delivery planning as a method to increase control over design costs
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Delivery planning is a method that determines which deliveries are expected to be delivered at any given time, and the dependency between different deliveries and stakeholders. This study aims to investigate whether the use of the […]
continue reading → -
Successful IT projects – A multiple case study of benefits management practices
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelHelene Berg a, Kjetil Holgeid b, Magne Jørgensen c, Gro Holst Volden dShow morehttps://doi.org/10.1016/j.procs.2023.01.482Get rights and contentAbstractDelivering project benefits for users and society is a key aspect of success in public IT […]
continue reading → -
Project ownership in public-private partnership (PPP) projects of Norway
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Decisions regarding contractual arrangements and selecting a procurement method are two major aspects of Public-Private Partnership (PPP). Given project ownership as one of the core elements of contractual arrangements, this study employs Binary Logistic Regression (BLR) […]
continue reading → -
Ethic Paths in Engineering Education
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Publication date: 2023Source: Procedia Computer Science, Volume 219Author(s): José Figueiredo Read Full Article Online
continue reading → -
Autonomy to Project Manager: How to Design?
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelAnnapureddy Rama Papi Reddy aShow morehttps://doi.org/10.1016/j.procs.2023.01.479Get rights and contentAbstractHigh-risk projects’ success depends on a quick response to the on-the-ground manifestation of the risk, and this warrants that the project manager (PM) be […]
continue reading → -
Analyzing the Nature of Contractor Claims and Strategies for their Effective Management: A case of BuildServe in Botswana
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelJ.K Ssegawa a, S. Keakile aShow morehttps://doi.org/10.1016/j.procs.2023.01.478Get rights and contentAbstractThough contractor claims are inevitable, the frequency of their occurrence and their impact on project cost, time or both, can be minimized with […]
continue reading → -
Exploring Measures to Promote Learning and Unlearning in Projects.
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelBassam HusseinShow morehttps://doi.org/10.1016/j.procs.2023.01.477Get rights and contentAbstractUsing a case study from the oil and gas sector, this paper attempts to identify the measures used by the project organization to foster a mindsett of […]
continue reading → -
Exploring Causes of Delay in Payment from Parties involved in Road and Highway Projects in Thailand
Published in ScienceDirect Publication: Procedia Computer Science By Abstract Author links open overlay panelBorvorn Israngkura Na AyudhyaShow morehttps://doi.org/10.1016/j.procs.2023.01.476Get rights and contentAbstractDelay in payment is considered to be one of the most periodically arisen problems in the construction industry. It harms time, cost, and quality. This […]
continue reading →